Octopus Agile Battery Calculator

All fields can be changed, but the PINK fields are the most common

Calculation Start Time
Battery Capacity (kWh)
Minimum Battery Level (%)
Expected Daily Consumption (kWh)
Charge Power from Grid (kW)
Battery Level Now (%)
Charge Start Time
Number of Consecutive Time Slots
Battery Level at Slot Start %
Battery Level at Slot End %
Slot Qty Required to Fill Battery

Calculator to work out how depleted the battery will be before re-charge, and how much charge it will have after re-charge.

Version 1.01 (January 30, 2025)